Construction · 03
Fire Protection Engineering
| Document | Phase | Routing | Status |
|---|---|---|---|
| FPE report — Phase 1 | Phase 1 | Bundled with GC building application | Approved |
| FPE report — Phase 2 | Phase 2 | Bundled with GC building application | Approved |
| FPE report — Phase 3 | Phase 3 | Separate submittal to Fire | In review |
| Master Egress Plan, sheet LS-2.2 | Phases 1–3 | TERP Consulting, PE stamped 06/21/2022 | Approved — plan of record |
| Places of Assembly occupancy plan | Annual | Separate submittal to Fire | Approved |
Routing
Master Egress and Places of Assembly documents move on two different tracks — bundled with the general contractor's building application, or filed as a separate submittal to Fire. The routing decision is recorded per document so nothing sits in the wrong queue.