UFC APEX FIRES
1,289Governing occupant load
3Approved bleacher configurations
2,563Exit capacity provided
1Permit covering the full calendar
Construction · 03

Fire Protection Engineering

Every engineered document tied to its phase, its routing path, and its current standing.

DocumentPhaseRoutingStatus
FPE report — Phase 1Phase 1Bundled with GC building applicationApproved
FPE report — Phase 2Phase 2Bundled with GC building applicationApproved
FPE report — Phase 3Phase 3Separate submittal to FireIn review
Master Egress Plan, sheet LS-2.2Phases 1–3TERP Consulting, PE stamped 06/21/2022Approved — plan of record
Places of Assembly occupancy planAnnualSeparate submittal to FireApproved
Routing
Master Egress and Places of Assembly documents move on two different tracks — bundled with the general contractor's building application, or filed as a separate submittal to Fire. The routing decision is recorded per document so nothing sits in the wrong queue.