UFC APEX FIRES
1,289Governing occupant load
3Approved bleacher configurations
2,563Exit capacity provided
1Permit covering the full calendar
Construction · 04

Inspection Log

Index of every inspection performed. Open a record for on-site corrections, deferred items and as-builts required for finals.

DateInspectionTypeInspectorResult
2026-07-14Sprinkler rough — under-bleacherRough-inCCFD Insp. AlvarezPass with corrections
2026-06-20Emergency lighting / exit signage walkLife safety walkFMC — C. GanierPass
2026-05-28Fire alarm device rough — mezzanineRough-inCCFD Insp. BoydFail