UFC APEX FIRES
1,289Governing occupant load
3Approved bleacher configurations
2,563Exit capacity provided
1Permit covering the full calendar
Ongoing Maintenance

Fire & Life Safety Maintenance

Testing schedules and historical records per system, kept current so a renewal or an inspection never starts with a scavenger hunt.

Systems registry

SystemFrequencyLast testNext dueStatus
Automatic sprinkler — arenaQuarterly / annual2026-06-152026-09-15Current
Fire alarm & voice evacuationAnnual2026-02-102027-02-10Current
Emergency & egress lightingMonthly / annual 90-min2026-08-012026-09-01Current
Exit signageMonthly2026-08-012026-09-01Current
Private hydrants & FDC accessAnnual flow2025-11-042026-11-04Due this quarter

Extinguisher log

Arena floor — northeast
2A:10B:C
Tag 2026-03
Due 2027-03
Mezzanine landing
2A:10B:C
Tag 2026-03
Due 2027-03
Production corridor
2A:10B:C
Tag 2026-03
Due 2027-03
Kitchen line
K-class
Tag 2026-03
Due 2027-03

Emergency plans & drills

  • 2026-05-19
    Staff evacuation drill
    Ops, security, ushers · Full clear in 6:42.
  • 2026-01-27
    Tabletop — medical surge
    Ops, EMS partner · Aisle access protocol revised.

First-in company coordination

  • Engine company site visitScheduled semiannually with the first-due company.
  • Facility walk notesBleacher deployment states walked at both extremes.
  • Access mappingFDC, riser room, and panel locations cross-checked against dispatch data.