UFC APEX FIRES
1,289Governing occupant load
3Approved bleacher configurations
2,563Exit capacity provided
1Permit covering the full calendar
Historical Record · 03

Decision Log

Why something is where it is. Verbal agreements, code-cycle exceptions, and the quiet details that only live in one person's head until they are written down here.

Grandfathered accessible seating count

2019 · Phase 1 plan review — verbal with reviewer of record

Accessible seating count was accepted under the code edition in effect at Phase 1 and has been carried across phases. Any future recount resets the basis to the current edition — do not volunteer a recount without evaluating the impact.

Exit 7 shared capacity split

2022 · Phase 2 egress analysis

Exit 7 carries 453 total capacity. The event space draws 75; the remaining 378 stays available to the balance of the building. That split is deliberate and is what keeps the arena permittable as its own envelope.

Floor seating stated as a maximum

2025 · Annual POA submittal

Floor seating is permitted as a 400-seat maximum rather than a fixed layout because it changes with every production. Any move to a fixed layout would require re-permitting variation event by event.

Sprinkler valve at the northwest riser

2021 · Facility maintenance — institutional

The northwest riser control valve serves both the under-bleacher branch and the production corridor. It is not labeled to reflect that. Do not close it for corridor work during an event build.

Purpose
This is the module that survives staff turnover. Every entry exists because losing it would cost the facility money, time, or an approval it already holds.