Rough-in · 2026-07-14
Sprinkler rough — under-bleacher
Pass with corrections
Discrepancies corrected on site
- Two hangers re-spaced at bank B travel path
- Escutcheon replaced at grid line 7
Discrepancies deferred
- Hydro certificate to be filed with as-built package
As-built items required for finals
- Under-bleacher branch line as-built required for final