UFC APEX FIRES
1,289Governing occupant load
3Approved bleacher configurations
2,563Exit capacity provided
1Permit covering the full calendar
← Inspection log
Rough-in · 2026-07-14

Sprinkler rough — under-bleacher

Inspector of record: CCFD Insp. Alvarez

Pass with corrections

Discrepancies corrected on site

  • Two hangers re-spaced at bank B travel path
  • Escutcheon replaced at grid line 7

Discrepancies deferred

  • Hydro certificate to be filed with as-built package

As-built items required for finals

  • Under-bleacher branch line as-built required for final